Back-End and Deck Piping
The area between the hopper and the boom - so called deck piping - is particularly critical in terms of wear, as this is where the pressure is at its highest. The points at which the pipeline narrows to DN 125 and reroutes into the riser are another two wear-intensive areas.
Putzmeister uses reinforced components that have been optimised for these specific areas with the objective of ensuring the same degree of wear along the entire pipeline. This maximises the service life and the delivery line can be replaced as a complete unit without having to sacrifice the remaining service life of individual pipes. This saves time and money and ensures that the concrete pump has a high availability rate.
The Putzmeister product series: Deck Delivery lines
The Putzmeister product series: Elbows
The Putzmeister product series: Reducers
Node: liferay-8677b559d4-fdf8w:8080: